more products
                        Products
            
        
                Featured Products
            
            
        
        Contact Details
    
    
Shandong Shangshun chemical wastewater ozone decolorization project
Project scale: 4000m³/d
Chroma processing value: 700 processing to 50
The project mainly deals with the decolorization of chemical wastewater produced within the enterprise. This project designed the ozone catalytic oxidation process, selected two 280m³VPSA oxygen system, two 35kg ozone generator supporting oxidation tower equipment.

Get the latest price? We'll respond as soon as possible(within 12 hours)
    



